Photo Gallery

The following are recent projects managed by Facilities & Project Management:

barnA

Replacement of the roof of Historic Barn A at the Agronomy Research Station in Stillwater.

RR1

Construction of the headhouse and greenhouse located in Stillwater.

RR2

Phase II of the greenhouse structures in Stillwater.

Dairy Barn

Renovation of the Dairy Barn Complex is scheduled for Fall 2008.  The scope will include re-roofing all 39,000 square feet of the dairy complex located in Stillwater, installin new metal edging and guttering and painting all vents and pipes.

sprec

Construction of the Swine Research and Education Center, which included 13 barns and treatment lagoons.

BIO

Construction of the Bioenergy Lab, a 4,000 square-foot, state-of-the-art laboratory housing OSU biofuels research and bioenergy laboratory.

efaw

Construction of the Entomology/Plant Pathology Barn, which will provide housing for station equipment and shelter for station herd. The 40’x60’ metal barn with 10’ lean-to and concrete floor was completed in September 2008.

cimval

Construction of the Cimarron Valley Station Headquarters in 2008.

old swine building

The 6th Avenue Swine Center was officially closed in accordance with the Oklahoma Department of Agriculture and the EPA in 2007.

altus

Currently under construction, a 40’ x 200’ tractor shed housing various pieces of station equipment.

Drip

Drip irrigation system that carries treated water from SREC to irrigate an adjacent field.